Powerlink Experience with Process Bus International IEC 61850 Process Bus User Task Force Meeting + Oct 2017 update.
IEC TC38 Activities: the IEC work’s progress in the field of IT, SAMU, LPIT and FPI By: Veselin Skendzic The discussion around the presentation above including Q&A by Veselin Skendzic is below. This meeting occurred July 26, 2017 with the Digital...Read More
NERC: CIP Implications of IEC 61850 in Transmission Stations Topics include: NERC CIP Implications of IEC 61850 in Transmission Stations Scott R Mix, CISSP, CIP Technical Manager, NERC • Application of NERC Standards • NERCDefinitions • What Does it ...Read More
Cisco: Time Sensitive Networking for IEC 61850 Substation Networks By: Maik G. Seewald, Patrick Wetterwald June 2017
Fundamentals of IEEE Std1815.1TM IEEE 1815 (DNP3) to IEC 61850 Mapping By Grant Gilchrist – What is it? – History: The SGIP 2.0 and PAP12 – Comparing IEEE 1815 (DNP3) and IEC 61850 – Sections of the standard – Topologies / Context – Conceptual Archit...Read More
This is a DigitalSubstations UTF meeting from Mar. 30, 2017 discussing: IEC 61850: Process Bus User Task Force – IEC 61869 vs. IEC 61850.
This presentation was conducted by Orion for the New Zealand Process Bus Experience.
TransGrid: Process Bus Initiative Slides were presented Oct. 31, 2016 by Kevin Hinkley
Process Bus Summary with supporting documents for Tenaga Nasional Berhad in Malaysia.
BC Hydro Protection and Control Planning Kelly Stich, Senior Engineer March 21, 2016